Immediately prior to flooding up, the Master, Chief Officer, Chief Engineer and Superintendent together with the Dock Master, Paint Manufacturer’s inspector and Ship Repair manager will carry out a final Dry-dock inspection to ensure that all Dock work has been completed and the vessel is in a fit condition to float.